Refine your search:     
Report No.
 - 
Search Results: Records 1-5 displayed on this page of 5
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Tests on decisive proof for the incinerating and melting facility using the in-can type high frequency induction heating

; ; Kato, Noriyoshi; Miyazaki, Hitoshi; Tanimoto, Kenichi

JNC TN9410 2000-002, 149 Pages, 1999/12

JNC-TN9410-2000-002.pdf:23.51MB

LEDF (Large Equipment Dismantling Facility) is the solid waste processing technology development facility that carries out high-volume reduction and low dosage processing. The high-volume reduction processing of the high dose $$alpha$$-waste configured with combustible waste, pvc & rubber, spent ion exchange resin, and noncombustible waste have been planned the incinerating and melting facility using the in-can type high frequency induction heating in LEDF. This test is intended to clarify the design data. It was confirmed that the incinerating and melting performance, molten solid properties and exhaust gas processing performance with pilot testing equipment and bench scale equipment. The result of this test are as follows. (1)Processing speed is 6.7kg/h for the combustible waste, 13.0kg/h for the ion exchange resin, and 30.0kg/h for the noncombustible waste. For above optimum processing conditions are as follows. (a)Operating temperature is 1000$$^{circ}$$C for the combustible waste, 1300$$^{circ}$$C for the ion exchange resin, 1500$$^{circ}$$C for the noncombustible waste. (b)Air flow is 90Nm$$^{3}$$/h. Air temperature is 300$$^{circ}$$C. Air velocity is 20m/s. (2)Incineration time per day is 5h. Warm-up time and incineration time from the stop of waste charging is 0.5h. Melting time per day is 5h inconsideration of heating hold time of incinerated ash and melting of quartz. Warm-up time is 0.5h. (3)The system decontamination factor in Co, Cs and Ce with pilot testing equipment is 10$$^{5}$$ or more. (4)Design data of the iron doped silica gel judged to be have a applicability as RuO$$_{4}$$ gas absorber is as follows. (a)Its diameter distribute in the range of 0.8-1.7mm. (b)To have a decontamination factor of 10$$^{3}$$ can achieve for retention time of 3 seconds and its life time is about 1 year. (5)In terms of the distribution of the nuclear species in molten solid is evenly distributed. It was also confirmed that the distribution of main elements in ceramic layer is ...

JAEA Reports

None

; ; Miyazaki, Hitoshi; ; Tanimoto, Kenichi; Terunuma, Seiichi

PNC TN9420 95-011, 13 Pages, 1994/10

PNC-TN9420-95-011.pdf:8.44MB

None

JAEA Reports

None

; Nakano, Tomoyuki; Miyazaki, Hitoshi;

PNC TN9420 94-015, 80 Pages, 1994/07

PNC-TN9420-94-015.pdf:2.92MB

None

JAEA Reports

None

; Miyazaki, Hitoshi; ; Tanimoto, Kenichi; Terunuma, Seiichi

PNC TN9420 94-010, 103 Pages, 1994/04

PNC-TN9420-94-010.pdf:2.89MB

None

JAEA Reports

None

*

PNC TN9080 93-002, 26 Pages, 1992/12

PNC-TN9080-93-002.pdf:1.0MB

None

5 (Records 1-5 displayed on this page)
  • 1